• 辣评 张学之:那些年厨卫展上的老人新面孔 2019-04-15
  • 甘肃警方破获一起“微信卖茶叶”特大新型网络诈骗案 2019-04-10
  • 纪检监察机关加强扶贫领域监督执纪问责工作 2019-04-10
  • 王宜林:推动“一带一路”战略实施 促进中国与合作国的友好关系 2019-04-06
  • 5月份全国财政收入稳步增长 支出结构不断优化 2019-04-03
  • 我没吹牛,我父亲真的参加过原子弹试验 2019-04-01
  • 市人大常委会召开党组会议传达学习全国两会精神张轩主持并讲话 2019-03-30
  • 驻最高检纪检组进一步规范涉案款物管理 2019-03-29
  • 96次航拍峨眉 换个角度看巴蜀名山 中国国家地理网 2019-03-29
  • 重大疾病贫困患者报销补偿比超90% 2019-03-28
  • 传媒每周热闻第359期:第41次《中国互联网络发展状况统计报告》发布 新浪微博热搜下线整改 2019-03-24
  • 推动第三代杂交水稻研究 2019-03-21
  • 辽宁快乐12和值尾走势图一定牛 > Solution > Reference Project > Oil & Gas and Mining >

    LGL Camp1 Project

    辽宁快乐12和值尾走势图一定牛 www.njxswq.com Client:

    Location: Lihir Island - PNG

    Project Scale:

    Period: Jan,2017-Now

    Project Name: LGL Camp1 Project

    Project Description

    The Lihir operation on Aniolam Island in the New Ireland Province of Papua New Guinea (PNG), 900 kilometres north-east of Port Moresby, is operated by Lihir Gold Limited, a subsidiary of Newcrest Mining Corporation.

     

    The gold deposit at Lihir is within the Luise Caldera, an extinct volcanic crater that is geothermally active, and is one of the largest known gold deposits in the world. Most of the ore is refractory and is treated using pressure oxidation before the gold is recovered by a conventional leach process. Lihir produces gold doré.

    In the financial year ending 30 June 2018, Lihir produced 955,156 ounces of gold. Since production commenced in 1997, the site has produced more than 10 million ounces of gold.

     



    Lihir Gold Limited is planing to Demolish and rebuild the camp1 which has runned over 25 years and finally decided to use Ark products, for a camp to accommodate over 1512 staffs in 2 shifts, Ark is going to supply 1120 x 20ft cabins in 5 years, as well as all electrical & plumbing & double pitch roofs, all design to meet Australia standards.

     

    The location of this project is close to the seashore so high anti-corrision will be required, hot-dip galvanizing has been used for the coating process to make the life time over 25 years in such a humility and salty conditions.

     

    The design of the building is 2 story building with skillion pitch roofs and an internal walkway, each room size 15m andcontains bathrooms, fire alarm system and electrical will be linked to exist systems.

     

    In addition, ARK units have been widely used and put somewhere else in the Mining Zones for Workshop, warehouse, security huts and site offices.

     

    Ark also provide BCA report and structure engineering as well as the local installation service together with Anitua who is Agent of Ark in Lihir.

     

    This project is still going and handed over one by one block, to be completed year 2021.Newcrest is happy with Ark qualities and cost effective.

    ------分隔线----------------------------
  • 辣评 张学之:那些年厨卫展上的老人新面孔 2019-04-15
  • 甘肃警方破获一起“微信卖茶叶”特大新型网络诈骗案 2019-04-10
  • 纪检监察机关加强扶贫领域监督执纪问责工作 2019-04-10
  • 王宜林:推动“一带一路”战略实施 促进中国与合作国的友好关系 2019-04-06
  • 5月份全国财政收入稳步增长 支出结构不断优化 2019-04-03
  • 我没吹牛,我父亲真的参加过原子弹试验 2019-04-01
  • 市人大常委会召开党组会议传达学习全国两会精神张轩主持并讲话 2019-03-30
  • 驻最高检纪检组进一步规范涉案款物管理 2019-03-29
  • 96次航拍峨眉 换个角度看巴蜀名山 中国国家地理网 2019-03-29
  • 重大疾病贫困患者报销补偿比超90% 2019-03-28
  • 传媒每周热闻第359期:第41次《中国互联网络发展状况统计报告》发布 新浪微博热搜下线整改 2019-03-24
  • 推动第三代杂交水稻研究 2019-03-21